Lagos Rooftop Services — Est. 2019

YOURROOF.OURHANDS.NOFLOOD.

Rope-rigged crews clearing blocked gutters across Lekki, Magodo, Victoria Island, and Ikoyi — before the April rains turn your compound into a lagoon.

Gutter technician in harness gripping rooftop drainage channel with Lagos skyline behind him

Chukwuemeka O. — Senior Rope Technician

"I know every roof slope in Lekki Phase 1."

340+

Roofs Cleared

7 yrsOperating in Lagos
1,200+Roofs Cleared
14Neighborhoods Served
0Missed Rainy Seasons

The Team

Meet Your
Crew.

No stock photos. No contractors on call. These are the people who will be on your roof — their names, their work, their record.

Chukwuemeka Okafor in safety harness on a Lagos rooftop clearing a gutter channel

Senior Rope Technician · 7 years

Chukwuemeka Okafor

Crew Member #1
"I know every drainage slope in Lekki Phase 1. The water tells me where the problem started."

Emeka joined Gutter in 2019 after five years rigging scaffolding for highrise construction on Adeola Odeku. He crossed over when he realized the real crisis wasn't building up — it was what happened when the rain came down.

He has cleared 340 rooftops across Lekki Phase 1 and 2, and can read a compound's drainage failure from street level before he ever climbs a ladder.

340

Roofs cleared

12

Estates on file

6 hrs

Avg job time

Drainage Map Coverage

Lekki Phase 1Lekki Phase 2ChevronAdmiralty Way

Worst Blockage Pulled

A 4-bedroom terrace in Lekki Phase 1 — three years of plastic bags, harmattan dust, and a dead pigeon compressed into a 6-metre channel. The downpipe had turned solid.

Gutter choked black with debris, leaves and plastic bags blocking drainage channel
Before
Clean gutter channel running clear after professional cleaning
After

Ready to clear your roof before the rains?

Book a Roof Inspection
Adaeze Nwosu reviewing drainage assessment notes on a Lagos commercial rooftop

Lead Inspector & Site Coordinator · 5 years

Adaeze Nwosu

Crew Member #2
"I do the assessment before anyone touches a rope. If I say the roof is ready, it is ready."

Ada came from quantity surveying before she realized she preferred the problem-solving end of construction. She now runs pre-job assessments for every commercial site — auditoriums, malls, church buildings — mapping drainage paths and identifying failure points before the crew arrives.

Her documentation of the Magodo flooding event in 2023 — tracing seven compound floods back to a single blocked municipal channel — was shared across three estate management WhatsApp groups and drove 40 new client calls in one week.

180

Sites assessed

100%

Pre-rain accuracy

3

Church roofs managed

Drainage Map Coverage

Magodo Phase 1Magodo Phase 2GRA IkejaOjodu Berger

Worst Blockage Pulled

A 1,200-seat Pentecostal church in Magodo — the false ceiling had been absorbing water for two rainy seasons before anyone noticed. The drainage channels above it were completely sealed with construction debris from a 2021 renovation.

Church roof drainage blocked with construction debris and accumulated leaves
Before
Church roof gutters cleared and flowing freely after Gutter crew intervention
After

Ready to clear your roof before the rains?

Book a Roof Inspection
Taiwo Adeleke in full rope access harness on a Victoria Island commercial building rooftop

Rope Access Specialist · 4 years

Taiwo Adeleke

Crew Member #3
"The high roofs are just another floor. The problem is always the same: nobody cleaned it last year."

Taiwo trained in industrial rope access — the kind used on oil rigs and bridge inspections. He brought that certification to Gutter to handle the duplex rooftops and multi-storey commercial buildings that standard ladders cannot safely reach.

He is the crew member called when the job involves a building over three floors, a steeply pitched tile roof, or a client who has been quoted "not possible" by three other contractors.

220

Roofs cleared

6+

Floors max height

0

Safety incidents

Drainage Map Coverage

Victoria IslandIkoyiOniru EstateEko Atlantic

Worst Blockage Pulled

A glass-and-steel commercial building on Adeola Odeku, VI — the architect had designed ornamental roof channels that were never meant to drain real Lagos rain volume. Taiwo redesigned the flow path on-site using temporary PVC rerouting while the permanent fix was engineered.

Commercial building ornamental roof channel blocked with debris and standing water
Before
Commercial building roof drainage running clear after rope access clearing
After

Ready to clear your roof before the rains?

Book a Roof Inspection

Book Now

Your Roof
Inspection
Starts Here.

Tell us your estate and we will send the right crew member — the one who already knows your drainage map.

01

Fill the form — estate name, property type, access notes.

02

We confirm within 4 hours with a crew name and time window.

03

Inspection completed. Quote delivered same day.

Already know the problem?

Inspection Request Form

We confirm within 4 hours by WhatsApp. No deposit required.

Skip the form?

Book Roof Inspection